Photographs

Coil Factory


Apr. 22 (Wed)

South-END suspension installation

May 13 (Wed)

East-FRONT suspension installation

Jun 18 (Thu)

BS, PO2 suspension preparation

Jun 22 (Mon)

PO2 suspension installation

Jun 24 (Wed)

BS suspension installation