Small Tasks ~ Status
(99/11/06
K. Arai)
D - Done
P - In progress
N - Not Yet
Recomb2
- D Alignment QPD centering
(Heinzel)
- D QPD circuit optimization
(Heinzel)
- D Test mass beam centering
(Somiya)
- N Alignment filter
improvement (Shinsuke)
- N Com/Diff alignment (Kawabe)
- N Deviation control (Seiji, Ocha)
- D Residual gas (Takahashi)
- N Steering-block hanging (Mio)
- D Improvement of Telescope (Mio)
- D Active/Pasive vibration
isolation (Takahashi, Ocha)
- D Slow drift compensation (Takahashi)
- D MC Alignment (Telada,
Kawabe) -> (Arai)
- D Intensity stabilization (Nagano)
- D Target auto control
(Fukushima)
- D AD-DA module/Video Module (Numata, Sekiya)
- D Lock Detector/Analog Switch (Arai)
Recycling
- N RM alignment (Kawabe, Heinzel)
- P RM Suspension assembly&install
(Takahashi)
- P RC length adjustment (Arai)
- P 3wm technique (Arai)
- N Shutter (Moriwaki)
- N 2wm technique -> To main stream
- N RM polish, coating -> To main stream
- N Peckle -> To main stream
Data Taking
- D DT1 (Tatsumi)
- D DT2 (Tatsumi)
- D Calibration (Telada)